To estimate a cycle time, work out each cut and then add what happens around the cutting. Spindle speed comes from surface speed and diameter, feed from spindle speed and chip load, and time is the length of cut divided by the feed. Add tool changes, moves and loading, then spread the setup over the quantity.

The calculator

Sample numbers. Replace them with your own.

The machine

A small cutter can call for more speed than the spindle has. The calculator holds each cut to this limit and slows its feed to match.

Cut 1
Cut 2
Cut 3
More cuts

Up to six. Use the tool maker's speed and feed for your material. A cut with no length is left out.

Around the cutting
The order

How do you estimate CNC cycle time?

One cut at a time, with three formulas. They are the same on a mill and a lathe. For milling and drilling the diameter is the cutter's; for turning it is the diameter of the work where the tool is cutting.

Spindle speed, rpm = 12 × surface speed in SFM ÷ (π × diameter in inches) = 3.82 × SFM ÷ diameter

Feed, inches per minute = spindle speed × feed per tooth × teeth (milling), or spindle speed × feed per rev (drilling and turning)

Time, minutes = length of cut ÷ feed

In metric the first line is spindle speed = 1,000 × cutting speed in metres per minute ÷ (π × diameter in millimetres), and the feed comes out in millimetres per minute. The other two lines do not change.

The surface speed and the feed per tooth come from the tool maker's chart for the material. The length of cut comes from the drawing.

What length of cut do you enter for each feature?

The length is the whole distance the tool travels in the metal, over every pass, not the length of the feature on the drawing.

Length of cut, by feature
FeatureLength to enter
Outside profileThe perimeter × the number of passes in depth, plus one more perimeter if there is a finish pass.
PocketThe floor area ÷ the stepover, × the number of passes in depth. A 3 × 2 in pocket at a 0.25 in stepover is 24 in of travel on each level.
Faced surfaceThe area ÷ the width the cutter takes on each pass.
Drilled holeThe depth, plus the drill point (0.3 × the diameter for a 118° point, 0.2 × for 135°), plus the clearance the drill starts from above the part. Enter that travel for one hole, with the number of holes beside it.
Tapped holeTwice the thread depth, because the tap feeds out as well as in. Enter it as a drilling cut with the thread pitch as the feed per rev: 0.05 in for a 1/4-20 thread.
Turned diameterThe length of the cut, with the number of passes beside it: the stock to remove on the radius ÷ the depth of cut, rounded up.

For a quote, the three or four cuts that remove most of the metal are enough. Chamfers, spot drilling and deburring passes are short; cover them by raising the allowance, not by measuring each one.

Worked example: a sample aluminum plate

These are the numbers the calculator opens with. They are samples to show the arithmetic, not recommended speeds and feeds and not typical times for any shop. The part is a 0.375 in aluminum plate with a profile and a pocket, eight 1/4 in through holes and a narrow slot, on a machine with a 10,000 rpm spindle.

The first cut is a 0.5 in, 3-flute end mill at 800 SFM and 0.004 in per tooth, over 110 in of travel:

3.82 × 800 ÷ 0.5 = 6,112 rpm

6,112 × 0.004 × 3 = 73.3 in/min

110 ÷ 73.3 = 1.50 min

Each hole is 0.375 in deep, plus 0.075 in for the drill point (0.3 × 0.25) and 0.15 in for the clearance above the part and the breakthrough below it: 0.6 in, eight times, is 4.8 in.

Sample cycle time for one part
StepSpindleFeedTime
0.5 in end mill, 3 flutes, 800 SFM, 0.004 in per tooth, 110 in6,112 rpm73.3 in/min1.50 min
0.25 in drill, 300 SFM, 0.005 in per rev, 8 holes of 0.6 in4,584 rpm22.9 in/min0.21 min
0.125 in end mill, 2 flutes, 800 SFM, 0.001 in per tooth, 20 in10,000 rpm (limit)20.0 in/min1.00 min
Cutting2.71 min
Moves between cuts, 10% of cutting0.27 min
Tool changes, 3 at 6 seconds0.30 min
Load and unload, 45 seconds0.75 min
Cycle time4.03 min

The third cut is the one to look at. At 800 SFM a 0.125 in cutter calls for about 24,400 rpm, and this spindle stops at 10,000. The feed drops with it, to 10,000 × 0.001 × 2 = 20 in/min, about 41% of what the chart speed would give, and the cut takes 1.00 min where the formula alone says about 0.41.

For an order of 20 with 45 minutes of setup, the job is 45 + 20 × 4.03 = 125.6 minutes, or 2.09 hours. That is 6.28 minutes a part. For one piece it is 49.03 minutes; for 100 it is 4.48 minutes each.

What does a cycle include besides cutting?

In the sample above, cutting is about two thirds of the cycle. The rest is time the formulas do not see:

  • Moves between cuts: rapids to the next feature, retracts between holes, and the lead-in and lead-out of each pass. The calculator takes these as a percentage of the cutting time. A part with many small features needs a higher figure than one long pocket.
  • Tool changes: count them from the list of tools, and time one on your own machine from the last cut of one tool to the first cut of the next.
  • Loading and unloading: opening the door, clearing chips from the vise or chuck, changing the part and closing up. On a short cycle this can be the largest line.
  • Checks in the cycle: probing, or a stop to measure a tight dimension. Add them to the load and unload time.

A part that is turned over for a second operation has two cycles. Estimate each and add them.

Why does the machine take longer than the estimate?

  • The spindle limit. Small cutters and drills in aluminum, brass and plastics often call for more speed than the spindle has, as in the example.
  • Acceleration. The formula assumes the machine is at the programmed feed for the whole cut. On short moves, tight corners and 3D surfaces it is speeding up or slowing down for much of it.
  • Deep holes. A peck cycle pulls the drill out to clear chips, and every retract is travel with no cutting.
  • Feeds turned down. A long tool, a thin wall or a part that is hard to hold gets run slower than the chart.
  • A short length of cut. Counting one pass in depth where the program takes three is an easy miss.

Fix the length of cut where it was miscounted. For the rest, when a job is finished, divide the time the machine took by the time you estimated, and keep that ratio for each machine. If an estimate of 4.0 minutes ran in 4.6, the ratio is 1.15, and the next estimate for that machine is multiplied by it. Those figures are samples; your own will differ from machine to machine and between simple and complex parts.

How do you estimate setup time?

Count the setups first. Every time the part is held a different way is a setup, and so is every machine it visits. Then, for each one, add up the tasks instead of guessing a single figure:

  1. Clear the last job: remove its fixture and tools, clean the table.
  2. Mount the workholding: a vise that is already on the table and square costs nothing; a fixture plate, a set of soft jaws to cut or a chuck change costs the most.
  3. Load and measure the tools that are not already in the machine. The number of new tools drives this line more than the part does.
  4. Set the work offset for each position.
  5. Load and prove the program, slowly the first time it runs.
  6. Make and inspect the first part, then adjust offsets until it is good. Tight tolerances make this the longest task, and it is easily left out.

Time each task on a few jobs and keep the figures by machine. A repeat order whose fixture, tools and proven program are waiting takes less than a first order, so the two should not carry the same setup.

There is no setup time that is right for every shop. Two shops with the same machine differ by their tooling, their workholding and how many jobs they change over in a day.

How do you estimate programming time?

Programming is done once for a part number, however many times it is ordered. It grows with the number of setups, the number of different features and tools, and above all with 3D surfaces and 5-axis moves; a plate of holes on a pattern takes very little. Fixture design, if the part needs one, belongs with it.

Quote it at the rate of the person who does it, not the machine's. On a first order it is either its own line or spread over that order's quantity. A repeat order that runs the same program carries none.

How do setup and cycle time become a price?

Setup is charged once per order and the cycle on every part, both at the work centre's hourly rate. Enter a rate in the calculator and its last table shows what the machine time for each part costs as the quantity changes. In the sample, setup adds 45 minutes to a single piece and 0.45 minutes to each of a hundred, which is why the price each falls so steeply over the first few pieces.

The rate comes from the shop rate calculator. Material, outside services and markup are added after: the guide to quoting CNC parts from a drawing covers the whole quote, and the quoting spreadsheet has a line for each operation's setup and run time.

RobinQuote drafts those lines from the customer's PDF drawing: the operations with a setup and run time for each, priced on your shop's own rates and past quotes, for an estimator to check and change.

Questions about cycle and setup time

How do you calculate CNC cycle time?

Work out each cut, then add what happens around the cutting. Spindle speed is 3.82 × surface speed ÷ diameter in inch units, feed is spindle speed × feed per tooth × teeth (or × feed per rev for drilling and turning), and the time is the length of cut ÷ feed. Add the tool changes, the moves between cuts and the time to load and unload the part.

How do you get RPM from SFM?

RPM = 12 × SFM ÷ (π × diameter in inches), which is 3.82 × SFM ÷ diameter. As a sample, a 0.5 in cutter at 800 SFM turns at 6,112 rpm. In metric, RPM = 1,000 × cutting speed in metres per minute ÷ (π × diameter in millimetres). If the answer is above the spindle's top speed, use the top speed.

What is the difference between setup time and cycle time?

Setup time is spent once per order, getting the machine ready: fixture, tools, offsets, program and a first good part. Cycle time is spent on every part, from loading one to loading the next. A quote charges setup once and cycle time multiplied by the quantity.

How close is a CAM system's cycle time to the real one?

It depends on the system and the part. An estimate that assumes the machine reaches the programmed feed on every move comes out short on parts with many short moves and corners, where the machine spends its time speeding up and slowing down. Compare estimates with the times of finished jobs and correct by the ratio.

Does programming time belong in the setup?

Keep it apart. Programming is done once for a part number, and setup is done again on every order. Charge programming on the first order, as its own line or spread over that order's quantity, and leave it off a repeat order that runs the same program.